Infrastructure
Gateways
4 gateways that have barriers systematized and a computer system that records incoming and outgoing containers, boat, trip number, destination port and all information related to containerized charge.
Esplanade 11.5 ha
The layout of the esplanade Allows Optimizing the use of space and time efficiently flow maneuvers containers from operations.
Power substation
With a capacity of 4000 kVA, suitable for refrigerated containers, lighting and port equipment.
Machinery
- 2 Panamax port cranes
- 1 Gotwald Mobile Crane
- 5 Reach Stackers
- 8 Lift Trucks
Piers
BERTHS LENGTH DEPTH
Pier 5 210 m 7.00 m
Pier 6 260 m 9.75 m
Infostructure
![]() |
![]() |
||||
Real Time |
Edi | ||||
Operations control in real time through art software. | Electronic transfer of information using internationally used standard for data exchange. |